Following the success of the design for the AlUla Studios, JTDA + OOAU were commissioned the second phase of the AlUla Film Campus. Together with Martin Zangerl (Bureau Mach), OOAU developed the design of two main buildings and the integration of the Utility area of the complex.
The main Office building will house the administration and local production support of the studio complex. The building includes management, engineering and suppling offices, as well as training rooms.
It also includes a 300m² a state-of-the-art recording studio, for music, scoring and sound recording.
The second building is a multipurpose communal space, equipped with an industrial kitchen for events, production catering or management of extras in large productions. The building has an accessible large roof benefiting from the amazing views to the surrounding landscape.
The second phase is currently under construction and expected to finish in early 2025.
Following the success of the design for the AlUla Studios, JTDA + OOAU were commissioned the second phase of the AlUla Film Campus. Together with Martin Zangerl (Bureau Mach), OOAU developed the design of two main buildings and the integration of the Utility area of the complex.
The main Office building will house the administration and local production support of the studio complex. The building includes management, engineering and suppling offices, as well as training rooms.
It also includes a 300m² a state-of-the-art recording studio, for music, scoring and sound recording.
The second building is a multipurpose communal space, equipped with an industrial kitchen for events, production catering or management of extras in large productions. The building has an accessible large roof benefiting from the amazing views to the surrounding landscape.
The second phase is currently under construction and expected to finish in early 2025.
Following the success of the design for the AlUla Studios, JTDA + OOAU were commissioned the second phase of the AlUla Film Campus. Together with Martin Zangerl (Bureau Mach), OOAU developed the design of two main buildings and the integration of the Utility area of the complex.
The main Office building will house the administration and local production support of the studio complex. The building includes management, engineering and suppling offices, as well as training rooms.
It also includes a 300m² a state-of-the-art recording studio, for music, scoring and sound recording.
The second building is a multipurpose communal space, equipped with an industrial kitchen for events, production catering or management of extras in large productions. The building has an accessible large roof benefiting from the amazing views to the surrounding landscape.
The second phase is currently under construction and expected to finish in early 2025.
Project Name
AlUla Film Campus, Phase 2
Project Type
Entertainment :: Office :: Industrial :: Hospitality
Location
AlUla, KSA
Program
Phase 1
1,700m² Multipurpose Building :: 3,450m² Office Building :: 2,300m² Utility Area
Total Campus
19,000m² GFA :: 87,000m² Site
Two Film Stages :: Two Set Workshops :: Two Production Buildings :: Main Office Building :: Multipurpose Building
Scope OOAU
Masterplan Design :: Architectural Design :: Design Management :: Wayfinding